1.1 COMPETITIVE COST SEALED BIDS
Sealed bids for construction of the Freeman Creek Lift Station Improvements for the Stephens County Development Authority will be received until the closing time of May 7, 2025 at 3:00 PM local time. Bids must be submitted by the Bidder electronically through QuestCDN.com. No paper submissions will be accepted. Any bid received after the bid closing time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically provided in the Instructions to Bidders and/or by State law. Base Cost of all Bids will be posted by the Owner/Engineer to the QuestCDN website within approximately 30 minutes after the bid closing time.
1.2 SCOPE OF WORK
The work to be completed shall consist of furnishing all materials, labor, and equipment necessary to complete the Freeman Creek Lift Station Improvements shown on the Drawings and as specified herein, including, but not limited to, pump installation, control panel installation, pipe preparation and coating, generator, gauges, grading, SCADA, crane, concrete, soil erosion and sediment control and grassing at the existing lift station site, construction exit, electrical, mechanical, painting and other appurtenances necessary to provide a complete and working installation.
For more information on the Bid for Freeman Creek Lift Station Site Improvements, visit this link.